GOODWINE STORE KIEV
Kiev – Ukraine
Scope of Work
- Installation of heating and cooling systems
- Ventilation and air conditioning systems (plumbing: 2000 m² air duct, 5 ventilating chambers)
- Plumbing
- Sanitary equipment
- Wastewater systems (5 km of pipes)
- Rainwater drainage system
- Technical rooms
- Electrical systems
Project Details
Project Duration
2012-2013
Client
Goodwine Group
Location
Kiev – Ukraine
Total Area
4500 m²