GOODWINE STORE KIEV

Kiev – Ukraine

Scope of Work

  • Installation of heating and cooling systems
  • Ventilation and air conditioning systems (plumbing: 2000 m² air duct, 5 ventilating chambers)
  • Plumbing
  • Sanitary equipment
  • Wastewater systems (5 km of pipes)
  • Rainwater drainage system
  • Technical rooms
  • Electrical systems

Project Details

Project Duration

2012-2013

Client

Goodwine Group

Location

Kiev – Ukraine

Total Area

4500 m²